One customer made blankets — 100,000 pieces a year. In one of those years, the volume grew to 270,000.
They ran a fully automated tender system: every supplier quoted online, the system shortlisted the top three, and a person decided who received the final order. Anyone could quote — which meant we could be replaced at any moment by someone a few cents cheaper.
I asked our factory engineer: can we still hold this order? He said: “Whatever they quote, they can’t make it. Unless they take what’s on my computer.”
He was right — and not quite right.
That year they changed sampling suppliers. They ran out of time and came back to us at the last minute. Twenty-seven colours, all sampled by us. The samples covered an entire wall.
Then the order went to someone else.
Later that factory could not finish the 270,000 pieces and asked us to help with tens of thousands. Their manager called me: “If it can be made like this, I could do it at their price too. But you have to tell me.” I said I did not know it could be made that way either — they won the order first and switched later; their cost model collapsed.
The product sold for six years. Consumers’ tastes stayed the same. The same fans bought the new batch and said it was completely different from what they bought last year and the year before. One complaint, two complaints, then a flood — that was when the customer realised.
Put the two batches side by side and they were completely different.
The supervisor was fired. That whole team was fired. Then they came back to us.
After they came back, we met in Jing’an, Shanghai. I said one thing in the meeting: “That year every sample was made by me, and the order did not come to us. You cannot do that. If you choose someone else, they should make the samples. Why should I make the samples and someone else get the order?”
The supervisor said: “We’re back now — let it go.”
In the end the responsibility was pinned on an inspector — he had not spotted the problem during inspection. He was fired. It was not really his fault.